Preparing a slatted cladding installation means planning the wall, its supporting battens and the finishing details together. This guide explains how to build a materials list for Majestic Prestige slatted cladding. Use it alongside the current product-specific installation guidance and your installer’s design for the building.
Measure walls, openings and reveals separately
Record the width and height of each elevation, then mark every window and door. Measure the depth of reveals as well as their perimeter. Note internal corners, external corners and exposed board ends.
Subtracting openings gives a useful estimate of net wall area, but it does not tell you exactly how many boards to buy. Cuts around windows can leave pieces that cannot be reused elsewhere. Draw the board layout and cutting plan before deciding your waste allowance.
Use the installed width
Prestige slatted cladding boards are 219mm wide overall and provide 200mm installed coverage. A 2.5m board covers 0.50m² and a 3.6m board covers 0.72m² before cuts and waste.
Example: a plain 4m-wide wall clad vertically needs 4 ÷ 0.2 = 20 board widths. If the board height suits a 2.5m board, twenty boards cover that uninterrupted face in theory. Check the starting and finishing details before treating this as a final quantity.
For a 3.6m-long board cut into shorter lengths, calculate where every piece will be used. Offcuts do not automatically remove the need for additional supporting battens or fixings.
Confirm support, ventilation and drainage
The product guidance specifies supporting battens at 500mm centres, with appropriate support at ends, joins, corners and openings. Double battening is preferred; the arrangement must preserve suitable ventilation and drainage behind the boards.
The wall construction and board direction matter. Do not block the intended drainage path with a trim or assume that a horizontal and vertical installation use the same supporting arrangement. Confirm fixings into the underlying wall and any membrane, flashing or cavity details with your installer.
Vertical boards: count installation clips and bottom clips separately
For a preliminary materials list, allow approximately five groove-side installation clips per 2.5m board or seven per 3.6m board, plus two bottom clips per vertical board. Fit an installation clip at every supporting batten; cuts, joins and openings can increase the total.
For twenty full 2.5m vertical boards, the starting allowance is 100 installation clips and 40 bottom clips. Installation clips and bottom clips are different products. This example gives the base quantity; check the finished support layout and allow for any extra fixing positions before ordering packs.
The vertical fitting sequence is to position the board, secure its groove-side installation clips, then fit the two bottom clips before moving to the next board. The bottom clips tuck into the bottoms of the hollow flutes and fix into the bottom batten, with the board bottom flush to that batten.
For horizontal installation, the two-bottom-clips-per-vertical-board calculation does not apply. Use one starter clip per supporting batten along the bottom row and follow the applicable fitting guidance.
Choose trims for their job, then their colour
Plan slatted cladding trims around each opening and corner. An internal corner finishes a recessed corner; an external corner suits an outward corner. Angle and reveal trims serve different edge details, so check the dimensions against your wall build-up.
Colour-matched trims and suitable matching-head screws give a coordinated finish. You can choose a contrast, but check the actual samples together. Trim lengths should be calculated from each edge and opening, allowing for cuts and joins, rather than applying a flat trim allowance per square metre.
Before installation day
- Check delivered boards, colours and accessory quantities.
- Confirm the layout, support positions and required movement allowances.
- Identify the right screw type and length for each fixing detail.
- Keep openings, drainage paths and ventilation details clear.
- Review the applicable warranty and installation documents.
- Confirm any building-specific requirements before starting work.
Explore the slatted cladding range and visualiser, or ask our team to review your materials list. For project-specific fire information, use the cladding documentation page.
Questions to settle before ordering slatted cladding
Should I choose 2.5m or 3.6m boards?
Compare both lengths against each wall dimension and the intended board direction. Draw the cuts, joints and support positions before choosing. A longer board is useful only when its extra length can be used within the installation design; an offcut allowance should be based on a cutting plan.
Check the 2.5m slatted cladding board and 3.6m slatted cladding board for the current options and product-specific documents.
Can I subtract every window from the board quantity?
Subtract openings when estimating net wall area, but check the actual board layout before reducing the order. Cuts above, below and beside a window may need separate pieces; not every offcut can be reused. Include the reveal and perimeter trims in the same plan.
Which instructions take priority for my installation?
Use the current installation document linked from your selected product together with the installer’s design for the building. This article helps prepare a materials list; it does not replace project-specific checks for the wall, fixings, ventilation, drainage or fire requirements.